Our client, a steel producer with 14 sites, had grown for years on a network nobody had a complete map of.
The challenge
Daily outages, uncontrolled access, and servers kept in rooms without ventilation.
The approach
- Full documentation and a network map in week one.
- Site-by-site migration on night shifts, with a rollback path for every step.
- Central monitoring with SMS alerts for the maintenance team.
The result
Zero minutes of production downtime, 80% fewer network tickets, and an infrastructure ready for the ERP rollout.
