Back to blog

How 14 industrial sites became one secure, monitored network in six weeks.

Our client, a steel producer with 14 sites, had grown for years on a network nobody had a complete map of.

The challenge

Daily outages, uncontrolled access, and servers kept in rooms without ventilation.

The approach

  • Full documentation and a network map in week one.
  • Site-by-site migration on night shifts, with a rollback path for every step.
  • Central monitoring with SMS alerts for the maintenance team.

The result

Zero minutes of production downtime, 80% fewer network tickets, and an infrastructure ready for the ERP rollout.

Back to home